Laundry Room Finishing, NOV 2024 - Toronto


Unfinished laundry room completion as per municipal order to meet fire code.


 

 
ILaundry Room - Initial Removal of secondary water heater and laundry sink. Re-route plumbing for stacked laundry. Demolition of walk-in closet to increase room space. Vapor barrier and framing start. Fresh water plumbing re-routing through wall and ceiling.
 

Sub base installation for tiling. 5/8" plywood. Power cables re-routed from failing joists to behind the wall frame. Failing joists sistered. Drywalling

Stacked laundry installed. Finishing Final